220 kV Mirama-Shango

Project Category Transmission
Project Name 220 kV Mirama-Shango
Donor/Funder African Development Bank (AfDB)
Effectiveness Date 19 Dec 2013
Closure Date 23 Feb 2016
Status Completed

Scope

This is a 220 KV line connecting Rwanda to Uganda with a  length of 93.5. It will facilitate the interconnection between the two countries.

Geographic Coverage

Mirama-Shango

Photos

Official REG energy infrastructure
Public summary
This is a 220 KV line connecting Rwanda to Uganda with a length of 93.5. It will facilitate the interconnection between the two countries.
Project category
Transmission
Project status
Completed
Donor / funder
African Development Bank (AfDB)
Project scope
This is a 220 KV line connecting Rwanda to Uganda with a  length of 93.5. It will facilitate the interconnection between the two countries.
Effectiveness date
Closure date
Geographic coverage
Mirama-Shango
Official project image
220 kV Mirama-Shango