220 kV Mirama-Shango
| Project Category | Transmission |
| Project Name | 220 kV Mirama-Shango |
| Donor/Funder | African Development Bank (AfDB) |
| Effectiveness Date | 19 Dec 2013 |
| Closure Date | 23 Feb 2016 |
| Status | Completed |
Scope
This is a 220 KV line connecting Rwanda to Uganda with a length of 93.5. It will facilitate the interconnection between the two countries.
Geographic Coverage
Mirama-Shango
Public summary
This is a 220 KV line connecting Rwanda to Uganda with a length of 93.5. It will facilitate the interconnection between the two countries.
Project category
Transmission
Project status
Completed
Donor / funder
African Development Bank (AfDB)
Project scope
This is a 220 KV line connecting Rwanda to Uganda with a length of 93.5. It will facilitate the interconnection between the two countries.
Effectiveness date
Closure date
Geographic coverage
Mirama-Shango