Overview
REF Window 5
In a move to increase Solar Home System (SHS) installations and electrification of households in rural areas of Rwanda, the Renewable Energy Fund (REF) and Rwanda Energy Access and Quality Improvement Project (EAQIP) off-grid component 3a implemented by the Development Bank of Rwanda Plc. have launched a Results-based Financing (RBF) subsidy called “RBF Window 5”.
The Subsidy is designed to address the affordability of SHS faced by rural households through the reduction of prices for the systems at varying amounts allocated to Ubudehe 1, 2, and 3 categories with the aim of reaching the lowest income population in Rwanda.
The FRW 29.24 billion (US$ 30 million) subsidy window is funded by the World Bank and is expected to trigger at least 370,000 off-grid connections. It is expected that this RBF facility will boost uptake of REF funds thus enabling the project to connect Rwandan households using off-grid solutions. The subsidy will be channeled through eligible Off-grid Solar Companies (OSCs) that have signed a Memorandum of Understanding with EDCL and the supplied SHSs must be meeting the Ministerial Guidelines on Minimum Standards Requirements for Solar Home Systems that was published in June 2019.
Click the links below for: |
Related Projects
110kV Jabana-Mt. Kigali-Gahanga and associated substations
The project consists of building a 27km long 110KV transmission line linking Jabana, Mont Kigali up to Gahanga Substation.
View project110 kV Gasogi-KSEZ
The project consists of building a 2.2km long 110KV transmission line linking Gasogi substation to Kigali Special Economic Zone
View project110 kV Single Circuit: Mukungwa-Nyabihu
The project consists of construction of 29km long transmission line linking Mukungwa to Nyabihu
View project220 KV Bwishyura-Kigoma-Rwabusoro
The project consists of building a 62 km long 220KV transmission line linking Bwishyura, Kigoma and Rwabusoro.
View project110 kV Rukarara-Kilinda
This is 110 KV transmission line with a length of 31.5km. It evacuates power from Rukarara Hydropower plant to Kilinda Substation
View project220/110 kV Mamba-Rwabusoro-(110kV) Bugesera- Gahanga
The project consists of building a 84.5 km long transmission line evacuating power from Hakan Peat to Power plant in Gisagara District up to Gahanga in through Rwabusoro and Bugesera substations
View project